CRAFTIMUS - Shipment Tracking
Direct Export Logistics

Track Your Shipment

Enter your reference below to track container shipment progress from our Gujranwala stone fabrication yard to your destination port. All milestones are logged directly with Port Qasim, Karachi Port Trust, and international ocean freight shipping lines.

Found on your formal Proforma Invoice or order confirmation.
The corporate email address used when placing the order.
Direct live check against export manifest
Recent lookups:
Shipment Reference MSCU7482910 Demo Data
Commodity & Quantity Polished Green Onyx Slabs • 1x 20ft FCL
Routing Corridor Port Qasim (PKBQM) → Port of Houston (USHOU)
Estimated Port Arrival [May 14, 2026]
Current Status
• In Transit (Indian Ocean)
Milestone Progression (7 of 9 Completed)
✓
Order Confirmed
[Apr 02, 2026]
✓
In Production
[Apr 08, 2026]
✓
Quality Check
[Apr 15, 2026]
✓
Packing
[Apr 18, 2026]
✓
Loaded in Container
[Apr 21, 2026]
✓
Departed Karachi
[Apr 24, 2026]
7
In Transit
Active at Sea
8
Arrived Destination
Pending ([May 14])
9
Delivered
Pending Clearance
Maritime Corridor Route [16 Days Remaining to Port of Houston]
Port Qasim, Karachi Departed [Apr 24]
Vessel: MSC LEANNE • Day 12 at Sea
Port of Houston, USA ETA [May 14]

Chronological Port & Customs Activity Log

Date & Time (UTC) Location Status / Milestone Description Vessel / Service
[Apr 28, 2026 - 14:20] Suez Canal Transit Corridor Vessel en route westward towards Mediterranean Gateway MSC LEANNE / V.2604W
[Apr 24, 2026 - 06:15] Port Qasim Terminal (PKBQM) Vessel departed origin berth. Ocean bill of lading activated. MSC LEANNE / V.2604W
[Apr 23, 2026 - 19:40] Port Qasim Terminal (PKBQM) Container loaded onto container vessel and lashed with steel ratchets. Cranes Bay 14
[Apr 21, 2026 - 11:30] Gujranwala Fabrication Plant Stowed inside 20ft container with ISPM-15 timber bracing. High-security bolt seal #PK77402 affixed. Bonded Truck #GRW-92
[Apr 18, 2026 - 16:00] Gujranwala Packing Facility Polished slabs packed into reinforced A-frame wooden crates with corner cushions. CRAFTIMUS Yard #2
Documentation Guide

Where to Find Your Tracking Number

Different stages of your order use different identifiers. Choose the number that corresponds to your paperwork.

Factory Production Phase

Order Number

Printed on your Proforma Invoice and initial dispatch schedule (e.g., CMX-2026-XXXX). Use this while your natural stone is being cut and packed in Gujranwala.

Full Container Load (FCL)

Container Number

Strict ISO 6346 standard format: 4 capital letters + 7 numbers (e.g., MSCU7482910 or MAEU1029384). Found on your Bill of Lading, container seal notice, and packing list.

Ocean Maritime Shipping

Bill of Lading (B/L)

The master maritime title document issued by the shipping line upon departure from Karachi (e.g., MEDUK1928301). Shown at the top right of your draft or original B/L.

Sample Boxes & Air Express

Air Waybill (AWB)

Used for 4x4-inch sample box briefcases dispatched via DHL Express, FedEx Priority, or UPS (e.g., DHL 10-digit number). Sent via automated email upon courier intake.

External Carrier Direct Portals

Track Container Shipments With the Shipping Line

For live satellite vessel telemetry, container terminal gate passes, and custom customs demurrage clocks, you can track directly on the carrier's official shipping line portal.

Export Clarity

Shipment Status Guide

Plain explanations for each stage of your commercial order, including required actions for your procurement desk.

1. Order Confirmed
Commercial contract signed, Proforma Invoice issued, and production deposit verified. No action needed from buyer.
2. In Production
Raw stone blocks are being wire-sawn, gang-cut, and calibrated to your specified slab or tile dimensions. No action needed.
3. Quality Check
Dry-lay surface inspection, thickness tolerance check (±1mm), and veining consistency photo logs sent for sign-off. Review inspection photos if required.
4. Packing
Stone items secured inside fumigated ISPM-15 wooden A-frames with foam interlayers and corner protectors. No action needed.
5. Loaded in Container
Crates stowed into 20ft ocean container at our Gujranwala yard, ratcheted with steel cables, and sealed with high-security bolt seal. Verify seal number on packing list.
6. Departed Karachi
Container cleared Pakistan customs gate and loaded aboard mother vessel at Port Qasim or KPT. Original or Telex release Bill of Lading generated.
7. In Transit
Vessel is actively navigating international waters towards your destination discharge seaport. Coordinate with your customs broker for import entry.
8. Arrived at Destination Port
Container discharged to container yard at arrival terminal. File customs declaration and pay local port dues to avoid demurrage.
9. Delivered
Container unsealed and offloaded at your warehouse or final project jobsite. Inspect crates and sign delivery receipt.
Delayed
Weather rerouting, canal congestion, or transshipment port roll over has adjusted estimated port arrival. Our export logistics team updates the ETA automatically.
On Hold
Pending documentation clarification, letter of credit amendment, or customs inspection hold. Check corporate email or contact your assigned CRAFTIMUS coordinator.
Global Seaborne Schedules

Typical Ocean Transit Times From Pakistan

Approximate container shipping durations departing Port of Karachi / Port Qasim. Port congestion and transshipment hubs may adjust schedules.

Destination Region Primary Discharge Seaports Service Route Type Estimated Ocean Transit
United States (East Coast / Gulf) New York (USNYC), Savannah (USSAV), Houston (USHOU) Trans-Atlantic via Suez or Mediterranean Hub [28 – 35 Days]
United States (West Coast) Los Angeles / Long Beach (USLAX), Oakland (USOAK) Trans-Pacific Feeder [32 – 40 Days]
United Kingdom Felixstowe (GBFXT), Southampton (GBSOU), London Gateway Direct Line Conference [20 – 24 Days]
Central Europe Rotterdam (NLRTM), Antwerp (BEANR), Hamburg (DEHAM) North Sea Direct / Gateway Feeder [22 – 26 Days]
Southern Europe / Spain Valencia (ESVLC), Barcelona (ESBCN), Algeciras Western Mediterranean Express [18 – 22 Days]
Cyprus Limassol Port (CYLMS) Eastern Mediterranean Feeder [14 – 18 Days]
Arabian Gulf (GCC) Jebel Ali (AEJEA), Dammam (SADMM), Hamad Port (QAHMD) Direct Arabian Sea Corridor [4 – 7 Days]
Customs & Compliance

Commercial Shipment Documents Issued

Every container load is backed by authenticated commercial documentation required for customs clearance at your port.

Commercial Invoice

Itemizes stone variety, square meterage, HS code (6802.21 / 6802.91), FOB/CIF unit pricing, and payment terms. Issued upon factory dispatch.

Packing List (Weight Calibrated)

Lists crate numbers, net/gross metric weights, exact bundle pieces, dimensions, and container bolt seal numbers.

Certificate of Origin (Form B)

Certified by the Chamber of Commerce and Industry Pakistan, certifying 100% natural Pakistani quarried origin.

ISPM-15 Fumigation Certificate

Official quarantine treatment certificate confirming solid timber A-frames and wooden crates satisfy international heat-treatment standards.

Learn about our zero-breakage export packaging protocols Review 4-tier crating, container ratcheting, and A-frame engineering standards.
See How We Pack and Load →
Clear Trade Answers

Frequently Asked Questions

Straightforward information regarding container tracing, vessel telemetry, and international delivery.

How do I track my container shipment?
Enter your 11-character ISO container number (e.g. MSCU7482910) or your CRAFTIMUS order number in the field above. You can also track directly through your ocean carrier's website using the container number or master Bill of Lading provided in your shipping advice email.
When does tracking start working after loading?
Factory dispatch status updates within 2 hours of container sealing in Gujranwala. Ocean carrier telemetry begins functioning once the container is gated into Port Qasim or KPT terminal and loaded onto the vessel manifest, usually 24 to 48 hours before vessel sail date.
Why does my container show no movement for several days?
During deep ocean transit (such as crossing the Arabian Sea or Atlantic Ocean), container vessels transmit updates primarily via coastal AIS and periodic satellite relays. A container showing the same status for several days indicates the vessel is sailing continuously between scheduled waypoints.
What is a Bill of Lading (B/L) and when is it issued?
A Bill of Lading is the legal maritime contract between the shipper and carrier verifying that goods have been received on board. The draft B/L is verified prior to sailing, and the final Negotiable or Sea Waybill B/L is released within [48 hours] of vessel departure from Karachi.
What should I do if my shipment is delayed?
Port weather, canal queueing, or feeder transshipment congestion can adjust container arrival schedules by 2 to 5 days. If a major delay occurs, our export documentation desk alerts your team and coordinates with your nominated customs broker to extend free-time storage agreements where applicable.
Can I track a 4x4-inch natural stone sample box parcel?
Yes. Select the Courier AWB tab on the tracker above and paste your 10-digit DHL Express or 12-digit FedEx tracking code. Sample boxes dispatched by air courier deliver directly to your office or showroom within [4 to 7 business days].
Who do I contact if there is a problem with my shipment?
You can immediately connect with our dedicated logistics desk via WhatsApp at [+92 321 2582 9100] or email [[email protected]]. For formal transit damage claims or cargo discrepancies, submit a direct filing via our Customer Complaint Procedure within [14 days] of port arrival.

Can't find your shipment?

Our Gujranwala export desk monitors container manifests 6 days a week. Send us your company name or Proforma Invoice number for an immediate manual manifest lookup.